Buyer worksheet · Massachusetts scopeCommercial solar and battery storage proposals
Compare what the proposal includes, who keeps it running and what can work during an outage.
All Energy Solar names Massachusetts commercial work
Its state page covers commercial solar from feasibility to grid connection. Licensing, battery scope and the site quote still need checking. See its stated scope
Tesla lists the parts of its commercial storage system
Megapack includes battery modules, bidirectional inverters, thermal management and controls. Installation price and Massachusetts project fit are not given. See the component scope
Will it run during an outage?
Outage operation needs the right inverter and storage configuration. The proposed loads and backup duration still need site design. How outage operation works
Compare commissioning, maintenance and the bid worksheet →
This draft combines Massachusetts MassCEC procurement guidance, an NREL equipment benchmark, and dated seller statements. Turnkey installed prices and project fit remain unknown. See the
source record and scope.
Continental Energy Solutions
Scope: Self-developing, designing, and installing commercial solar and battery storage solutions (90+ solar PV projects, several solar+storage projects, Oak Brook IL)
O&M: Commercial & industrial PV preventative maintenance and inspections by NABCEP professionals, electricians, and engineers (PV systems specified; battery O&M not separately detailed)
Warranty / MA license / price: Unknown.
Source details: cesnrg.com · vendor statement
All Energy Solar
Scope & territory: Headquartered in St. Paul, Minnesota; commercial solar and battery storage contractor (referral reward up to $5,000 disclosed on event page)
O&M / Warranty / MA license / price: Unknown in read pages.
Source details: www.allenergysolar.com · vendor statement
Freedom Power
Scope & Warranty: 25-year lifetime product warranty claimed; commercial solar & backup battery options (Austin TX HQ; examples cite TX & CO)
O&M: Sold commercial solar warranty & service rights (~400 systems / ~70 MW) to Otovo (Feb 4, 2026), while Freedom Power continues new commercial installations
Source details: www.solarpowerworldonline.com · trade-press report
Independent federal cost benchmark (not an installer)
NREL ATB 2024b (Commercial Battery Storage)
NREL 2024b ATB C&I Li-ion benchmark (100-2,000 kW DC, 1-8 hr): ex-factory battery $164-$215/kWh + central inverter $97.5/kW DC (2022 USD; excludes EPC installation)
Ex-factory battery & inverter benchmark in 2022 USD; excludes EPC installation, switchgear, permitting, and interconnection.
Source details: atb.nrel.gov · independent federal benchmark
More useful detail
Short guides for the next question