Itemized cost

A total split into named parts (equipment, EPC labor, switchgear, interconnection). NREL 2024b ATB C&I Li-ion benchmark (100-2,000 kW DC, 1-8 hr): ex-factory battery $164-$215/kWh + central inverter $97.5/kW DC (2022 USD; excludes EPC installation).

Find this field in the worksheet →

Financing cost

The fees, interest rate, or PPA escalator attached to the proposed financing structure.

Find this field in the worksheet →

Operations and maintenance (O&M)

Planned preventative maintenance, remote monitoring, battery augmentation, and inverter replacement scope after commissioning.

Find this field in the worksheet →

Performance metric

Expected kWh generation, round-trip storage efficiency, and demand-charge kW shaving over a named period.

Find this field in the worksheet →

Commissioning

Witness testing, utility permission-to-operate (PTO), and handover steps before final acceptance.

Find this field in the worksheet →

Payback period

Projected years for bill and demand-charge savings plus ITC/depreciation to recover net capex; check utility tariff assumptions.

Find this field in the worksheet →

Source details: atb.nrel.gov · independent federal benchmark

See the full proposal worksheet → · ← Back to the landing page

Will the system work when the grid is down?

DOE · Solar during an outage

DOE explains that solar-only systems generally stop during an outage; standalone operation needs a properly configured inverter and storage.

The source uses a residential example and separately discusses commercial/community microgrids. It does not establish a particular commercial site's backup duration. Source