Itemized cost
A total split into named parts (equipment, EPC labor, switchgear, interconnection). NREL 2024b ATB C&I Li-ion benchmark (100-2,000 kW DC, 1-8 hr): ex-factory battery $164-$215/kWh + central inverter $97.5/kW DC (2022 USD; excludes EPC installation).
Find this field in the worksheet →
Operations and maintenance (O&M)
Planned preventative maintenance, remote monitoring, battery augmentation, and inverter replacement scope after commissioning.
Find this field in the worksheet →
Payback period
Projected years for bill and demand-charge savings plus ITC/depreciation to recover net capex; check utility tariff assumptions.