How to compare commercial solar and storage proposals

Start with the sourced handover and maintenance fields below, then use the ten-item worksheet for your bidders.

Paper worksheet: Print this page for handwritten bidder notes; the ruled boxes below are non-editable print spaces. Checkboxes mark which items to request.

Swipe sideways on the table to compare Bidder 1, Bidder 2, and Bidder 3 →

Massachusetts buyer checklist. Three bidder columns with blank name and answer spaces.
Request itemBidder 1Bidder 2Bidder 3
TimelineProject timeline and next stepsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
CostTotal and itemized installation costWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
FinancingFinancing options and associated costsWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
EquipmentEquipment make, model, and warrantyAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
PermitsPermit acquisition planAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
Operations & maintenanceOperations and maintenance cost and planWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
PerformanceProjected monthly, annual, and lifetime performance in named metricsWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
CommissioningPost-commissioning procedureWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
TeamProject team experience and certificationsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions
Savings & paybackProjected electric bill savings and payback periodWhat this term meansAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptionsAnswer, unit, period, and assumptions

Source details: www.masscec.com · independent public procurement guidance

← Back to the quick checklist

Handover and operation: put the deliverables in writing

These federal technical references help define the request; the utility and signed bid must supply the site-specific answer.

DOE · Before design is final

DOE's procurement guidance calls for utility checks on interconnection capacity, upgrades and any integration study.

Federal-facility guidance is a useful technical reference; it does not determine this buyer's Massachusetts utility approval or costs. Source

DOE · Commissioning deliverables

DOE points to system documentation, array testing and whole-system performance testing under IEC 62446.

This is a procurement-reference recommendation, not a claim that any listed installer follows it. Source

DOE · Budget after handover

DOE recommends budgeting monitoring, preventive maintenance, repairs and major component replacement.

Keep the maintenance allowance separate from the equipment warranty and initial installed price. Source

DOE · A useful maintenance commitment

DOE says the contractor should follow the response times in the O&M plan when a system underperforms.

Ask for the actual response and visit schedule; a monitoring dashboard alone does not establish either. Source