FIELDNOTE ERCOT POWER

BUYER GUIDE · SYSTEM CONTEXT

4CP questions to ask your electricity supplier

Ask how any demand or 4CP charges are calculated, passed through and reconciled in the contract. The reviewed ERCOT index is supporting context.

ERCOT index context

ERCOT index points to DSP calculations for June–September; linked files/dates not audited ERCOT 4CP index ↗ · Source date

Shared evidence limits.

VENDOR ADVISORY PROGRAM · NRG ENERGY / RELIANT SUBSIDIARY

Reliant 4CP alert tiers (described on parent NRG page)

NRG notes ERCOT 4CP uses four 15-minute summer peaks (June–September) on IDR meters and demand charges can reach 30–70% of C&I bills; Reliant (NRG subsidiary) offers a no-charge basic 4CP program (up to 20 alerts/summer) and paid premium tiers: Selective 4CP (12 alerts/yr, 45 min at 2 p.m. CT) and Highly Selective 4CP (5 alerts/yr, 30 min at 3:30 p.m. CT).

NRG educational article (June 21, 2023); advisory curtailment alerts only, not contractual rate caps or guaranteed savings. NRG 4CP article ↗ · Source date

Ask the supplier to show you

Quote checklist · Back to quote guide

Read the demand basis on your delivery bill

These Oncor examples do not replace another TDU’s tariff, and 4CP alerts are not a promised saving.

Oncor · Demand measurement

Oncor records the highest 15-minute demand during the billing month.

This kW measure differs from total kWh consumption. It is Oncor delivery context, not a retail supplier price. Source

Oncor · Why lower use may not lower billing demand

Oncor says billing kW often uses the greater of current NCP demand or 80% of the highest monthly NCP in the prior 11 months.

The applicable tariff and rate schedule control. NCP is the site's non-coincident peak; this rule is not asserted for every Texas customer. Source

Oncor · Returning to the smaller rate class

Oncor says demand must stay at or below 10 kW for 12 consecutive months to move to its ≤10 kW schedule.

Applies to the named Oncor secondary-service schedules, not all TDUs. Source

Oncor · Which demand basis is on the bill?

Oncor's >10 kW explanation lists transmission recovery using NCP kW or 4CP kW.

Ask which basis your tariff uses before estimating savings from 4CP curtailment. Source

ERCOT · 4CP reference months

ERCOT publishes 4CP calculations for June, July, August and September.

The index is a reference for distribution-service-provider calculations, not a customer's tariff or a curtailment saving guarantee. Source