FIELDNOTE ERCOT POWER

TEXAS · COMMERCIAL ELECTRICITY · 6 of 13 ENTITIES REVIEWED

Texas business electricity quote guide

Compare published pricing basis, contract term limits, and TDU/4CP qualifications across 5 reviewed Texas retail suppliers before requesting identical quotes.

Published pricing basis, terms & qualifications

Monthly gas vs 15-min index details →

Reliant

Supply structures
Pricing basis

Fixed price, monthly NYMEX natural-gas index (until fixed lock by phone), percent fixed/index, and block & index.

Published term

3–60 months on fixed price; gas index adjusts monthly until locked.

Material qualification

Large-business product descriptions; customized offers, not a quote or executed contract.

Reliant page ↗ · Source date

TXU Energy

Supply structures
Pricing basis

Fixed Price, Block and Index, and 100% Real-Time Index (15-minute ERCOT intervals plus management fee structure).

Published term

Contract term lengths not published on reviewed page.

Material qualification

Fee amount, TDU charges, and 4CP pass-through terms require a written quote.

TXU page ↗ · Source date

Gexa Energy

Two supply pages
Pricing basis

BasicBundle Power (fixed commodity $/kWh) and SupplyIQ Power (managed index, block, heat rate, and Retail + Renewables hedging).

Published term

Up to 96 months on BasicBundle (longer if creditworthy); multi-year hedging on SupplyIQ.

Material qualification

Optional fixed capacity/transmission; total bill adjusts for TDU charges, third-party fees, and regulatory changes (see EFL/TOS).

BasicBundle ↗ · Source date · SupplyIQ ↗ · Source date

Constellation

Supply structures
Pricing basis

Fully Bundled Fixed Rate (supply rate fixed, total bill varies with usage) and Custom Texas plans (fixed/variable elements vary).

Published term

Contract term lengths not published on reviewed Texas page.

Material qualification

Eligibility depends on location and utility territory; local utility sets distribution charges and maintains meters.

Constellation page ↗ · Source date

APG&E

Coverage-only evidence
Pricing basis

Commercial contract structures (fixed vs index) not published on reviewed page; quote required.

Published term

Contract term lengths not published on reviewed page.

Material qualification

PUCT Certificate No. 10105; C&I supply across 6 Texas TDUs (CenterPoint, Oncor, AEP Central/North, Lubbock Power & Light, Texas New Mexico Power).

APG&E page ↗ · Source date

Coverage-only entries (APG&E) and unpublished terms stay explicit unknowns. Reliant/NRG 4CP curtailment alerts live on 4CP & demand · Scope & source method

Less energy does not always mean less demand billed

Oncor says billing demand often keeps an 80% floor from the highest monthly peak in the preceding 11 months. The applicable tariff decides whether this applies to your site. Separate demand from 4CP

Go deeper