Glossary
Backup and disaster recovery terms
Short definitions for planning a recovery test and comparing vendor claims.
- Backup
- A saved copy of data that can be used to recover it later. A backup is useful only if the needed data can be found and restored. Plan a restore test →
- Disaster recovery (DR)
- The people, steps and systems used to restore services after a serious outage. It includes more than keeping backup copies.
- Recovery time objective (RTO)
- The longest time a business can accept before a service is restored. Measure it with a test of the full service, not only a file transfer.
- Recovery point objective (RPO)
- The oldest data a business can accept after recovery. It sets how much recent work may be lost.
- Immutable backup
- A backup copy configured to resist changes or deletion for a stated period. The storage and identity settings determine how it works. Review vendor claims →
- Recovery rehearsal
- A planned test in which a team restores a selected workload, checks that it works, and records time and gaps.
- Retention
- How long a backup copy is kept. Longer retention can change storage needs and quote costs.